Skip to content
Layered hybrid cloud infrastructure visualisation

Cloud & Transformation

Migration programmes designed around the network they depend on

Cloud migration, data centre exit, Azure and AWS connectivity and hybrid cloud infrastructure — planned with the connectivity, latency and resilience realities that determine whether the programme lands.

The challenge

Migrations stall on infrastructure decisions made too late

Application teams plan the move; the network, interconnect and dependency mapping arrive afterwards. Cutover windows slip, latency-sensitive workloads underperform and the legacy data centre stays open longer than budgeted.

  • Application dependencies discovered during migration rather than before it.
  • Interconnect capacity and routing designed after workload placement is fixed.
  • Hybrid states that were intended to be temporary and became permanent.
  • Data centre exit dates driven by lease expiry rather than technical readiness.

Our solution

Infrastructure-led migration planning

We baseline the estate and its dependencies, design the target hybrid architecture and the connectivity underneath it, then sequence migration waves so each one is independently reversible. Connectivity, security zoning and operational handover are designed as part of the programme rather than bolted on.

Enterprise data centre facility at dusk

Core capabilities

What we deliver

Cloud migration

Assessment, wave planning, landing zone connectivity and cutover governance.

Data centre migration

Physical and logical relocation, colocation selection and exit planning.

Azure connectivity

ExpressRoute design, redundancy models and regional routing policy.

AWS connectivity

Direct Connect architecture, transit routing and multi-account network design.

Hybrid cloud

Coherent addressing, routing, security zoning and identity across on-premise and cloud.

Infrastructure transformation

Target operating model, tooling and run-state design for the post-migration estate.

Business outcomes

What changes for the organisation

Reversible

Migration waves with defined rollback positions and tested cutover runbooks.

Deterministic

Private interconnect performance for latency-sensitive and regulated workloads.

Closed

Data centre exits completed against contractual dates rather than extended.

Operable

A run-state designed, documented and handed to a service that can support it.

How it works

Programme structure

Four stages, each gated by evidence rather than optimism.

  1. 01

    Baseline

    Estate discovery, dependency mapping, performance and compliance constraints.

  2. 02

    Target design

    Landing zones, interconnect, routing, security zoning and placement decisions.

  3. 03

    Migration waves

    Sequenced cutovers with runbooks, test criteria and rollback positions.

  4. 04

    Run state

    Operational handover, monitoring, optimisation and decommissioning.

Typical engagements

Where organisations engage us

Data centre exit

Lease expiry forcing a move to colocation and public cloud within a fixed window.

Regulated workload placement

Balancing sovereignty, latency and resilience across regions and platforms.

Post-migration remediation

Stabilising a hybrid estate that migrated without a network architecture.

Next step

Start with a conversation, not a quote

Book a discovery workshop with a solutions consultant. We will review your current estate, target architecture and commercial constraints before recommending anything.